Following a shutdown over the Christmas holiday, the concrete tie beam has been completed at the mid point of the rear wall and also the capping beam on the east pile wall. Concreting has also been done on the higher of the two west wall capping beams and the excavation…
Some really good progress with excavating, exposing the rear wall of micro-piles. The excavation is to the level required to micro-pile the walls the retain the sides of the plot. The excavations have exposed the drain that sits on the boundary of the plot, showing some leaks which will need…
A more imaginative title will come soon…. First major problem has come up… The main drain from the road above is supposed to run through a two metre separation between the plots. However, it has been placed right on our boundary instead and means that the micro-pile wall needs to…