Week 6

Some really good progress with excavating, exposing the rear wall of micro-piles. The excavation is to the level required to micro-pile the walls the retain the sides of the plot. The excavations have exposed the drain that sits on the boundary of the plot, showing some leaks which will need…

Continue reading