Some really good progress with excavating, exposing the rear wall of micro-piles. The excavation is to the level required to micro-pile the walls the retain the sides of the plot. The excavations have exposed the drain that sits on the boundary of the plot, showing some leaks which will need…
A more imaginative title will come soon…. First major problem has come up… The main drain from the road above is supposed to run through a two metre separation between the plots. However, it has been placed right on our boundary instead and means that the micro-pile wall needs to…
Ok, so not too much to show, but it is a momentous moment after a difficult two years in the making. Setting out the site is the first task to be undertaken.