Work has stalled slightly on the ground floor slab, with only work on the rear half, as a number of the posts at the front of the basement were demolished due to defects. The formwork has just started to be installed in the front section, where the outdoor kitchen will be placed.
Further formwork and progress has been made on the main swimming pool basin and chill-out zone.